/
Configuring Zephyr Add-On
Configuring Zephyr Add-On
Configuring Zephyr Enterprise Test Management Add-on as a build task
- Click “Add task” to add more tasks to the plan and select task “Publish Test Results” from “Tests” task type
- Configure Zephyr built task
- Provide a task name
- Select the Zephyr URL from the dropdown. (Servers configured in the Bamboo global configuration are available here to select). This automatically pulls in Zephyr projects, releases and cycles
- Select the Project Name from the dropdown. This re-populates the releases
- Select the Release from the dropdown. Selecting a release fetches all its cycles
- Select either an existing Cycle from the dropdown or create a new cycle. The recommended approach is to use an existing cycle to be able to ensure the reporting is correct.
- When users select a "New Cycle" option, only the test cycle gets created and it will not create a new set of test cases every time. Only the existing test cases are created. The reporting is available for each test cycle created.
- For a new cycle, you have option to select cycle duration from the dropdown and edit the default cycle prefix name “Automation”. In the absence of a cycle prefix name, “Automation” is used for any new test cycles.
- When users select an "Existing Cycle" option, for each Jenkins build, the automation phase is added to the same cycle. This will be reflected in the reports.
- For an existing cycle, the default Cycle Duration will be that of the existing cycle in Zephyr and the cycle name prefix will be the format “Automation_<Date><Time>” stamp.
- When users select a "New Cycle" option, only the test cycle gets created and it will not create a new set of test cases every time. Only the existing test cases are created. The reporting is available for each test cycle created.
- To create a package structure while creating and organizing the test cases, check the box “Create Package Structure”
- Click "Save"
- The parser task ie. “Junit Parsing” and “Zephyr Reporter” task needs be made final tasks to ensure these tasks are executed irrespective of job failure due to test failures
, multiple selections available,
Related content
What's New in Zephyr Enterprise 8.1.0
What's New in Zephyr Enterprise 8.1.0
Read with this
Configuring Zephyr Add-on
Configuring Zephyr Add-on
More like this
Configuring Bamboo Build Plan
Configuring Bamboo Build Plan
Read with this
Configuring Zephyr Add-on as a Build Task
Configuring Zephyr Add-on as a Build Task
More like this
Integration with TestComplete
Integration with TestComplete
Read with this
Publishing Results to Zephyr
Publishing Results to Zephyr
More like this