Info

 Prior to using JIRA Requirements Sync

Prior to using JIRA Requirements Sync, the user must be on the Requirements page within a specific project/release. There must also be a JIRA instance connected to this project and there must be existing requirements in JIRA for the connected JIRA instance.


Info

Release 6.2 brings the release specific requirement tree structure which fixes JIRA sync limitation in 6.1.2 where:

  • If the same JQL is used in multiple releases of the same project, the requirement(s) and requirement tree auto changes will only get reflected to the latest release of a project. 

Any JIRA sync that has the same JQL from any (different) releases of same project that is migrated from 6.1.2 over to 6.2 will need to have their JIRA sync re-created to utilize features from 6.2, so that it is able to maintain the same requirement(s) in the multiple requirement tree.

Duplicate folders inside a parent requirement tree are not allowed. If an auto Jira Sync operation occurs, multiple folders with same name  are created and they need to be deleted manually before a JIRA sync can be re-saved.

Scenario: You are a current user in Zephyr. As a user in the system, you want to be able to sync your requirements from JIRA using the JIRA Requirements Sync feature on the Requirements page in the Zephyr system.

...