Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

After migrating ALM users and execution statuses, you can run several instances of the wizard to start simultaneous migration of migrate multiple projects simultaneously. The project migration procedure consists of three stages:

...

  1. Make sure the names of all ALM tests, releases, cycles, phases and so on contain at least two characters. If you have such entities, please rename them before migration. Otherwise, they will be ignored.

  2. Rename ALM release folders if they contain special or international characters. Otherwise, they will be ignored.

  3. If you have a project with the same name in Zephyr, delete or rename it.

  4. Start the .jar file you downloaded at the previous step when migrating users (hpqc-zee-x.x.x.jar):

    • Open the command prompt.

    • Navigate to the directory where the .jar file is located.

    • Run the following command:

    java -jar -Dserver.port=44444 -Xms2048m -Xmx2048m hpqc-zee-x.x.x.jar

    hpqc-zee-x.x.x.jar is the file you downloaded. For example, hpqc-zee-1.5.5.jar.
    Dserver.port is the port on the server where the .jar file will run.
    Xms2048m and -Xmx2048m are the minimum and maximum memory that can be allocated for running the .jar file:

    Image RemovedImage Added

Migration steps

...

1. Open your browser and enter <IP address>:<port> where <IP address> is that of the computer where you ran the JAR .jar file and <port> is the port number you specified when running the JAR .jar file. For example, localhost:44444. The migration wizard will open:

...

1. Create a new folder and place the downloaded .jar file in it.
2. Run the file and specify a different port in the following command: java -jar -Dserver.port=44444 -Xms2048m -Xmx2048m hpqc-zee-x.x.x.jar.
3. Repeat all the migration steps (1-7), but this time, at step one1, enter the port number you specified in the command.

...

Post-migration steps

After migrating all of your projects, you need to do the following:

  1. Disable the users that are disabled in HP ALM (all the imported users are enabled in Zephyr).

  2. Perform full reindexing in Zephyr.

See Also

ALM Migration Wizard Overview
Set Up ALM Migration WizardPlanning
FAQ