Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 9 Next »

Table of Contents


Introduction

Zephyr HP ALM Migration Adapter is a unique API-driven solution that lets you migrate your data from HP ALM directly into Zephyr Standalone. The solution works with either an On-Prem or a Cloud installation of Zephyr Standalone.

The HP ALM Migration works with HP ALM 11.5 and above. Users can retrieve the HP ALM Migration Adapter from the following download page.


Planning

Planning is an important phase of migration. This phase involves:

  1. Determining HP ALM artifacts that need to be migrated

  2. Reviewing environments and configurations

  3. Optimizing stage environments

The sections below explain these in more details:

  • Determine HP ALM artifacts that need to be migrated

    It is important to acknowledge that not all the data you have in legacy system remains good to be transferred. In this phase, you should review how your testing methodologies and practices have changed over time and determine the right HP ALM artifacts that makes sense to transfer to Zephyr.


  • Review environments and configurations

    Not all HP ALM environments are configured the same. Please review the hardware configuration, memory allocation, API throttling configurations, network topology etc for each HP ALM environment.


  • Determine the migration style

    There are two possibilities for the migration: big bang migration or trickle migration.

    In big bang migration, the process is conducted over a weekend when both HP ALM and Zephyr are shut down for users. With this approach, we suggest at least one dry run of the migration in a stage environment before the live event.

    In trickle migration, you may take an incremental approach by having both HP ALM and Zephyr available in parallel during weeks/months, and moving projects from HP ALM to Zephyr based on business needs.

    With either approach, we undertake at least one week of review, preparation and optimization of stage environment; this includes optimization of system that has Zephyr HP ALM Migration adapter installed. Full access to stage environment is required.


Adapter Overview

The Zephyr HP ALM Migration adapter uses REST APIs to extract data from HP ALM and import data into Zephyr Standalone. The section below provides a high-level overview of the communication between the Zephyr Standalone instance, the HP ALM instance, and the Zephyr HP ALM Migration adapter:


Supported Migration Entities

The current version of the Zephyr HP ALM Migration Adapter supports migration of the following types of entities:

  • Projects
  • Users
  • Tests
  • Test Attachements
  • Test Steps
  • Step Attachments
  • Test Folder Organization
  • Test Custom Fields
  • Release
  • Cycle
  • Test Run (Execution in Zephyr)


Migrating Defects from HP ALM to Jira

The current process for migrating historical defects from HP ALM into JIRA involves the following steps:

  • The defects are exported from HP ALM using APIs available from HP
  • The defects are then imported into JIRA by using JIRA REST API calls or via a .CSV file


Setup & Usage Instructions

For setup and usage instructions, please refer to ___.


Additional Questions

For any questions, please contact Zephyr Support: https://support.getzephyr.com


  • No labels