Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 14 Current »

Table of Contents



Setup Instructions

Below steps provides a high-level overview of adapter setup instructions.

1. Download and copy Zephyr HP ALM adapter jar file on to a standalone machine that has access to both HP ALM and Zephyr

Download the 'HPQC-ZS-<release>' file from the following page: https://support.smartbear.com/downloads/zephyr/

2. Install JRE 1.8 or higher

3. Allocate at least 10 GB of memory for the adapter process (data is processed in batches to optimize performance and reduce memory usage). System should have 16 GB memory in total.

4. Ensure you can access HP ALM using admin credentials

5. Ensure you can access Zephyr using Test Manager credentials

6. To start the jar, open the command prompt or terminal.

7. Navigate to your directory (dir) where the jar is located.

8. Type the following command

The -Dserver.port uses the port for the server that needs to be started on.

The -Xms2048m -Xmx2048m are the minimum and maximum memory required that needs to be allocated for the jar.

java -jar -Dserver.port=44444 -Xms2048m -Xmx2048m hpqc-zs-1.3.jar

9. Open and go your your browser to access the adapter. To navigate to the adapter, enter in your <IP address>:port number into your browser address.

For example, you would enter something similar to 'localhost:44444' into your browser address to access the adapter (Using 'localhost:44444' is shown as an example and your IP address/Port number may be different).


Usage Instructions

The steps below show the typical flow for migrating a single project (Domain) from HP ALM to Zephyr Standalone:

Step 1: Provide the Zephyr and HP QC Configuration information

Step 2: Edit and validate the correct configuration information

Step 3: Click 'Next' after validating information

Step 4: Choose your domain

Step 5: Select the project to migrate

Step 6: Select any import project options that you want migrated to Zephyr

Step 7: Click on 'Start Importing' and wait for the migration to finish

Step 8: After migrating, review the migration report provided


Additional Questions

For any questions, please contact Zephyr Support: https://support.getzephyr.com

  • No labels