Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

After migrating all of your projects to Zephyr, you need to perform the following post-migration steps:

...

1. Run the .jar file you downloaded when performing preliminary steps:

  • Open the command prompt.

  • Navigate to the directory where the .jar file is located.

  • Run the following command:

...

2. Perform full reindexing

Now you need to perform full reindexing.

Once done, you can start working with your migrated projects in Zephyr.

...