2. In the subsequent dialog, populate all the required fields (the ones marked with a red asterisk) and specify any relevant information in the other fields, if needed:
...
Available fields:
Summary (required) | A short description of the issue. |
Description (required) | Detailed information about the issue. |
Component | The component the defect relates to. |
Version | The current version of your project. |
Status (required) | The defect status. Possible values:
|
Assignee (required) | The user the defect will be assigned to. |
OS | The operating system used. Possible values:
|
Priority | The defect priority that ranges from P1 to P5, where P1 is the highest priority. |
Target Milestone | The target version in which the issue should be resolved. |
Severity | The defect severity. Possible values:
|
Hardware | The type of the computer used. Possible values:
|
...